Audacity for Windows 3.5.0
Audacity is free software, developed by a group of volunteers and distributed under the GNU General Public License (GPL). Audacity supports uncompressed audio standards such as WAV and AIFF in addition to OGG and MP3 files. A full complement of basic effects such as reverb, delay, and compression are included. Virtual Studio Technology (VST), Linux Audio Developers Simple Plugin Architecture (LAPSDA). ...
Author | Audacity |
License | Open Source |
Price | FREE |
Released | 2024-04-22 |
Downloads | 1136 |
Filesize | 15.10 MB |
Requirements | |
Installation | Instal And Uninstall |
Keywords | audio editor, record sound, play sound, recorder, editor, playback |
Users' rating (80 rating) |
Using Audacity for Windows Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of Audacity for Windows on rapidshare.com, depositfiles.com, megaupload.com etc.
All Audacity for Windows download links are direct Audacity for Windows full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, Audacity for Windows keygen, crack.
Consider: Audacity for Windows full version, change order full download, premium download, licensed copy.