ECTkeyboard 74.381.23
ECTKeyboard (EyeComTecKeyboard) is a program with a text matrix that allows individuals with limited motor skills to type text. The program works with eye tracking applications (ECTCamera and analogues), allowing to select characters through blinking, muscle contractions or other actions. ECTKeyboard has a flexible interface configuration, language input and character selecting delays. Saves all settings in files for subsequent work. ...
Author | EyeComTec (LAZgroup S.A.) |
License | Freeware |
Price | FREE |
Released | 2017-01-07 |
Downloads | 555 |
Filesize | 3.20 MB |
Requirements | no |
Installation | No Install Support |
Keywords | Virtual keyboard, virtual mouse, text editor, Assistive technology, paralysis, AAC, disability |
Users' rating (20 rating) |
Using ECTkeyboard Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of ECTkeyboard on rapidshare.com, depositfiles.com, megaupload.com etc.
All ECTkeyboard download links are direct ECTkeyboard full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, ECTkeyboard keygen, crack.
Consider: ECTkeyboard full version, change order full download, premium download, licensed copy.