Key Remapper 1.11
Key Remapper allows you to block and remap keys, mouse buttons and mouse wheel actions to other keys, mouse buttons and the mouse wheel rotation and combinations of the above actions with modifiers. It also makes it possible to emulate double mouse button clicks or double key presses and allows you to set the necessary interval between presses. Remapping and blocking options can be restricted to specific programs or windows. ...
Author | ATNSOFT |
License | Free To Try |
Price | $24.95 |
Released | 2019-01-04 |
Downloads | 866 |
Filesize | 1.71 MB |
Requirements | Windows 10/8.1/8/7/Vista/2008/2003/XP/2000 |
Installation | Install and Uninstall |
Keywords | key, keyboard, mouse, button, wheel, remap, remapper, map, press, block, hotkey, shortcut, manager, automate, keyremapper, block, press, release, action, accelerator, keystroke, combination, paste, text, copy, repeat, atn, atnsoft |
Users' rating (28 rating) |
Using Key Remapper Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of Key Remapper on rapidshare.com, depositfiles.com, megaupload.com etc.
All Key Remapper download links are direct Key Remapper full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, Key Remapper keygen, crack.
Consider: Key Remapper full version, change order full download, premium download, licensed copy.