Windows 8 RTM Build 9200
Windows 8 is designed to be the first Windows client to support systems on a chip (SoC) architectures, including ARM, and since it will be pre-installed on a range of next generation devices, it will also feature Metro, a NUI + GUI interface on the surface combined with a new application platform under-the-hood designed to enable the creation of immersive experiences. ...
Author | Microsoft |
License | Trialware |
Price | $119.99 |
Released | 2012-08-16 |
Downloads | 8678 |
Filesize | 3000.00 MB |
Requirements | |
Installation | Instal And Uninstall |
Keywords | Windows Operating System, Windows 8, Windows OS, Windows8, Windows, Operating System |
Users' rating (157 rating) |
|
Our rating |
![]() |
Using Windows 8 Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of Windows 8 on rapidshare.com, depositfiles.com, megaupload.com etc.
All Windows 8 download links are direct Windows 8 full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, Windows 8 keygen, crack.
Consider: Windows 8 full version, change order full download, premium download, licensed copy.